Search results on southwark.gov.uk
-
CAB2749
Adobe Portable Document Format : 30KB https://democracy.winchester.gov.uk/Data/Cabinet/201512021000/Agenda/CAB2749.pdfapproved the recommendations of report CAB2709 which set out the business case for the provision of...highlighted the concerns of the practice patients and its doctors that the surgery may have to move out...Ms Davies welcomed the recent plans on display for a new surgery, but urged the Council to ensure that...
-
CAB2972 Winchester Sport and Leisure Park Project - Procurement
Adobe Portable Document Format : 1MB https://democracy.winchester.gov.uk/data/cabinet/201711131400/agenda/cab2972%20winchester%20sport%20and%20leisure%20park%20project%20-%20%20procurement.pdfa specific period. 8 CAB2972 The framework agreement sets out the process which will be used...The tables set out at Appendix 3 set out the options to procure an operator....of the aspects set out above....
-
PDC0615-Schedule-16-February-2006-Item-04-Norton-Manor-Bullington-Road
Adobe Portable Document Format : 141KB https://democracy.winchester.gov.uk/data/planning%20committee/200602160930/agenda/pdc0615-schedule-16-february-2006-item-04-norton-manor-bullington-road.pdfDevelopment plan policy does allow, in exceptional circumstances for exceptions to be made, but the...These include a timetable for the carrying out of emergency works and the ultimate completion of the...The heads of terms are set out in the recommendation below....
-
29 Jul 2010 9.30 am
https://democracy.winchester.gov.uk/celistdocuments.aspx?committeeid=137&meetingid=1292&df=29%2f07%2f2010&ver=2Item04 PDC0863-Item05 PDC0863-Item06 PDC0863-Item07 PDC0863-Item08 PDC0863-Item09 6Application to carry out...
-
CAB2584
Adobe Portable Document Format : 134KB https://democracy.winchester.gov.uk/Data/Cabinet/201406051000/Agenda/CAB2584.pdfAny proposals in which the limitations set out below in the Delegated Matters would be exceeded....place, at appropriate phases throughout the development; • Dealing with the issues which arise out...In order to do this, the Forum shall:- • Discuss the issues which arise out of these opportunities...
-
Public reports pack PDF 2 MB
Adobe Portable Document Format : 1.8MB https://democracy.winchester.gov.uk/documents/g163/public%20reports%20pack%2009th-jul-2018%2018.30%20the%20overview%20and%20scrutiny%20committee.pdf?t=10The Plan has been set out in the following sections: Section A – Cabinet and Committees Section B -...2.1 Full details are included in Section 11 but, briefly, the Council achieved a small net surplus...I&E but reversed in See note below 0 28,441,246 28,258,749 (182,496) Balance Sheet Surplus for year...
-
KBF24 Appendix 1 Programme and Implementation Letter 17.10.2019 , item 6. PDF 1 MB
Adobe Portable Document Format : 1.2MB https://democracy.winchester.gov.uk/documents/s8668/kbf24%20appendix%201%20programme%20and%20implementation%20letter%2017.10.2019.pdfthe development (Appeal reference APP/L1765/A/10/2126522, planning application reference 09/02412/OUT...and design of the Neighbourhood Centre was informed by the consultations carried out in 2016....of the phases is likely to be built- out....
-
PDC0892-App3
Adobe Portable Document Format : 323KB https://democracy.winchester.gov.uk/data/planning%20committee/201103211000/agenda/pdc0892-app3.pdfMayer had been earmarked as not important for retention, but which no longer Brown to provide an additional...Full details of the works and financial contribution will be set out in the S106 which will be finalised...comprehensive response but will be submitted by the end of modelling. week commencing 28/02/11...
-
Agenda reports pack PDF 4 MB
Adobe Portable Document Format : 4.1MB https://democracy.winchester.gov.uk/documents/g235/public%20reports%20pack%2010th-jul-2018%2016.30%20cabinet%20central%20winchester%20regeneration%20committee.pdf?t=10Legislation stipulated that this was required to be for a six week period, but the Council was to extend...The Committee agreed to the following for the reasons set out above and outlined in the Report....(ii) The building is substantially built but in need of modernisation and refurbishment....
-
PDC1012-Item01
Adobe Portable Document Format : 506KB https://democracy.winchester.gov.uk/data/planning%20committee/201412110930/agenda/pdc1012-item01.pdfApplication) which will replace Block B as set out in the Section 73 Application....However, in schemes such as this, which will be built out over a long period, the figures on which viability...but where each is broadly subordinate to the whole street....