River Park Leisure Centre Main Pool

The consultation process has involved a variety of engagement methods to gather comments and concerns on the proposals to build a replacement centre at Bar End, to the east of the existing stadium. Those consulted include:

  • existing leisure centre users

  • sports clubs

  • local residents

  • local land owners

  • national governing bodies of sport

  • local businesses

In 2013 an exhibition was held between 18 November to 2 December 2013 on the leisure centre proposals. (Options considered during 2013/14). The detailed comments received at this time are available on request, please contact