Local Plan Documents
On this page you can find documents relating to the preparation of the Winchester District Local Plan Review (WDLPR) and other background documents relating to the WDLPR and the previous Local Plan (1998).
To view the adopted WDLPR 2006 please follow this link (click here).Winchester District Local Plan Review (2006) - Documents published during the preparation stages of the Local Plan Review.
Winchester Review Local Plan Deposit 2001
Responses to representations on First Deposit Local Plan
Local Plan - Revised Deposit 2003
Representations on the Revised Deposit Local Plan 2003
Inquiry Inspectors Report - Sept 2005
Proposed Modifications to the Local Plan Review (2006)
Other Background Documents
The following documents either informed the Local Plan Review process or support policies in the Local Plan Review (but cannot be adopted as either supplementary planning guidance or a supplementary planning document).
Adopted Broadway Friarsgate Planning Brief (2003)
This Broadway/Friarsgate Planning Brief has been the subject of informal and formal consultations carried out by the City Council over a four-year period.
Housing Monitoring Report - January 2004
The second in a series of three Housing Monitoring Reports. The Report provides an overview of housing land supply, drawing on relevant information and data from a number of sources
Housing Needs Survey 2002
In July 2002 Winchester City Council commissioned DCA to undertake a District-wide Housing Needs Assessment and projection of housing need, as the basic building block in informing housing, planning and care strategies for the future.
Sutton Scotney Development Brief
This Design and Development Brief sets out principles for the redevelopment of the Old Station Yard site and adjoining former Taylors Coaches site at Sutton Scotney.
Winchester District Local Plan (Adopted 1998)
The Winchester District Local Plan was adopted on 22 April 1998, and was superseded by the Winchester District Local Plan Review on 7th July 2006
Winchester Retail Study 2003
The key objective of this report was to calculate the scope and need for Winchester to accommodate additional retail floorspace over a planned period up to 2011
Urban Capacity Study Document
This study examines the capacity of the defined build up areas to meet the housing requirements of the district until the year 2011














